AAI绣球AI选电影
The Old Gotthard Tunnel Route - Driver's Eye View
AI选片

The Old Gotthard Tunnel Route - Driver's Eye View

2018United Kingdom112 分钟

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…

站内评分—
IMDb—
豆瓣—
浏览热度0
QUICK FACTS

《The Old Gotthard Tunnel Route - Driver's Eye View》快速了解

在AI绣球查看《The Old Gotthard Tunnel Route - Driver's Eye View》:2018年 · United Kingdom · 112分钟。AI选片视角整理剧情、评分、片长与相关推荐。

上映年份2018
国家/地区United Kingdom
片长112 分钟
语言en

AI绣球 的整理视角

本站以“AI选片”为主要发现入口。把想看的感觉说出来,用更自然的方式找到电影。 本页把影片的上映信息、片长、评分、剧情与相关推荐集中到一个页面,方便继续检索和比较。

常见问题

《The Old Gotthard Tunnel Route - Driver's Eye View》是哪一年的电影?

《The Old Gotthard Tunnel Route - Driver's Eye View》的上映年份为2018年。

《The Old Gotthard Tunnel Route - Driver's Eye View》片长多少?

当前资料显示《The Old Gotthard Tunnel Route - Driver's Eye View》片长约112分钟。

《The Old Gotthard Tunnel Route - Driver's Eye View》来自哪个国家或地区?

当前资料将《The Old Gotthard Tunnel Route - Driver's Eye View》标注为United Kingdom作品。

《The Old Gotthard Tunnel Route - Driver's Eye View》主要是什么语言?

当前资料显示《The Old Gotthard Tunnel Route - Driver's Eye View》的语言信息为en。

AI选片

热门正在升温

按热度发现近期被频繁查看的电影

查看更多 →
SEARCH DISCOVERY

AI选电影

全部专题短时长精选开心喜剧约会爱情烧脑悬疑轻松家庭